2027 Budget Files
Below are the Budget files used to calculate the budget for 2027. If you would like to have the actual Excel Spreadsheets contact the President to receive them.
How’d We Do in 2026?
Starting with the analysis of the budget and actual spending for 2026, you see that we overspent by $63,421. This does not mean that this money was misappropriated. It means that we got some things done that we didn’t anticipate last year at this time, but the Board voted during the year to get them done any way.
This includes the security lights on the buildings (RS-24 – BUILDING-exterior flood lights & Basement Lights). The replacement / upgrade of these lights had been planned since 2023 and never got completed until the end of 2025 with the payment being completed in 2026. So the project extended over a period of a few years which is why it got missed in the 2026 budget. Notice however that the electric bill is starting to come down which is what we had anticipated with the investment in this project.
Second is the sewer repairs. We clearly did not budget enough for this last year and exceeded our budget amount by $21,000. And the water bill (county controlled cost) increased without warning by $7,500.
The Planter box project went over by a small amount ($2700) and other necessary landscaping was done that the Board approved to get done now rather than waiting to continue getting the exteriors and grounds appearance which is part of the curb appeal, to a higher level creating an overspending of approximately $14,650.
The benches were not included in the 2026 budget because at the time of the budget planning we did not yet have a contractor identified or the costs per bench available. The total cost of labor and materials for building the benches is approximately $6,600. The total cost of preparing the wood was about $1500, giving a total cost of $8,100 for 13 benches that will last a life time! That is approximately $650 per bench! The reserve study table of costs has been updated to show benches only needing minor maintenance with life span of 100 years. This is accurate because it is Honey Locust wood.
The Board is dedicated to holding to their fiduciary responsibilities when spending the Council’s funds and as such will pledge to hold more closely to the approved budget in the future.
Budget Assessment Calculations 2027
The table below shows 4 assessment options. None are excessive. Option 1 is simply to bring the assessments to an even number, something a few people complained about over 2025 – 2026 This equates to an approximately 1.56 % increase.
The table includes the points that are to be used as ratios for the assessments based on the number of bedrooms and as per Sussex Square Declaration Article IV Section a.
The Board will be deciding which assessment option is to be used for the 2027 budget at the next Regular Meeting (December 8, 7 PM).
Proposed 2027 Budget Options
Having completed now two of the major expense projects on our maintenance schedule, the goal is to rebuild our funds while following the reserve funding allocations and continuing to complete other scheduled maintenance on our list (see the reserve study maintenance schedule list below.) Keep in mind that one of the goals of this Board is to minimize future maintenance expenses. One way to achieve this goal is to replace items manufactured with materials that have a longer life span than the residential grade off the shelf items do. This was achieved with the benches being made with Honey Locust wood that has a life span that is difficult to calculate because it is one of the hardest woods existing in the natural world. The Board will also select commercial grade moisture resistant materials in the future for any items that need to be replaced.
However, there are many expense items whose cost cannot be controlled and which keep increasing in cost becoming major expenses for this community. This Board will continue to seek out solutions that are long lasting and more cost efficient.
In the budget document below, the items that are listed first in the budget table are our Operating Expenses. These are recurring operational expenses that are not considered maintenance & repair items. Many of these are the expenses include some of the highest in our financial plan, yet we cannot control them and they therefore drive our assessment increases.
First is the insurance premium. The Board has worked hard to keep this premium at a minimum. This year the Board approved increasing the deductible for the master policy from $10,000 to $25,000 reducing what would have been a 8.7% increase to a 7% increase in the premium. While this doesn’t sound like that much it equates to about $4,000 per year reducing the quoted premium from $91,000 to approximately $87,000 per year. It is the per year part that adds up over time. The increased deductible can be set aside once and even gain a small amount of interest transforming an increase in deductible into a small investment as well as a decrease in the fee.
The water bill is another item that we cannot exactly control coming in this year at $44,000. Wow! The increase in the costs of approximately $8,000 is believed to be the increase in the water use and sewage fees set by the county, not by any significant increase in usage. The Board will investigate this over the next year, however.
The trash removal service is another large expense also in the $40,000 range, that we cannot exactly change. We negotiated a lower fee with Republic, the contractor, at the beginning of this year, but that negotiated price doesn’t seem to have been extended after those conversations ended. The Board will analyze these costs more over the next few months and seek a new service who can offer a lower price. Our neighbors (The Pointe) did the same thing last year, probably for the same reason.
Last listed in the budget is our punch list of maintenance items taken from the Reserve Study Maintenance Schedule (Reserve Fund Expenses For 2027). Some of these we cannot change either, mostly on-going maintenance items, such as tree trimming and of course the maintenance of our sewer system.
The budget for the sewer system for 2027 is based on the actual costs from 2026 totaling $48,000. Hopefully it will be less than that in 2027. It is feasible that this number could be lowered with the help of the homeowners by taking care what they put into the sewer system and by stopping the use of their garbage disposals. The Board is considering the possibility of having the garbage disposals removed to help keep this cost minimized. The old pipes are only part of the problem. Garbage disposals allowing large scraps (like eggshells) and uncut vegetables to be put into those old pipes is what causes the backups.
The assessment increase option selected will drive what we can afford to accomplish in 2027. Continuing with the curb appeal improvement goal, makes things that can be seen driving through the community a higher priority over other items on our Reserve Study Maintenance Schedule. So replacing the rusted old mail boxes seems to be a favorable choice.
Some of the electrical boxes in the basements which control our exterior lighting however also need to be replaced which effects both interior and exterior. Anything being replaced in the basements should be replaced with materials that can withstand the moisture that is inevitable in those basements. So while this may add a slight increase in the initial cost, it will eliminate future maintenance costs down the road. (I’ve never heard of a circuit breaker box rusting, and yet all the ones in the basements are doing just that.)
The same applies to the doors. The doors and door frames need to be replaced with commercial grade fiberglass, not steal so that the moisture in the basements doesn’t continue to deteriorate them and causing a shorter life span and increasing our maintenance costs.
The budget is here for your review. At the December meeting the Board is only voting on which assessment option to use. The Board welcomes input regarding the budget both assessments as well as which projects are competed in 2027. Please plan to come to the meeting if you have any questions or concerns regarding the budget.
Reserve Study Scheduled Maintenance Table
The following table is derived from the 2023 Reserve Study. This study unfortunately had many errors – maintenance items that were not the responsibility of the Association and maintenance items that were just missed or bloated in the price. As a result I (Your President) have been analyzing it on my own and updating it with numbers and maintenance items that make sense. The new Reserve Study is due in 2028. The corrected maintenance items will be provided to the reserve study engineer for review at that time and the new study should incorporate these items. You will see below in the list that the reserve study items 2 – 15 are deleted. These are pool maintenance items. As per the agreement with Quest Management, Sussex Square does not have authority to dictate the pool area repairs and maintenance. Plus Sussex Square only pays a portion of those expenses (26.5%). Quest has been consistently over the last few years contracting for maintenance and repairs that equates to about $5,000 for Sussex Square. So it becomes simply a recurring cost to Sussex Square of $5,000 which is listed as item 1 in the table.
Any item that has a decimal point as the line item number is one that is added/inserted that was not identified in the original study.
Please look over this list and try to understand it. If you have any questions bring them to any meeting and we’ll get them answered.